MINIMUM ACTIVITIES
REQUIRING THE CERTIFIED UST INSPECTOR’S PRESENCE.
The
certified UST inspector shall be present for the
performance of the following activities:
-
In the case of an UST
installation, examination of the excavation
prior to the physical placing of the UST system
into the ground, the in- ground test of the
piping prior to backfilling the piping, and the
final tightness test prior to placing the UST
system into service;
-
In the case of an UST upgrade for
tanks, immediately before purging operations
begin, immediately before the tank is cut open
for entry, the final tightness test prior to
placing the UST system back into service and the
final inspection of the upgrades provided the
inspection does not require entry into an UST by
the certified UST inspector;
-
In the case of an UST upgrade for
piping, the in-ground test of the piping prior
to backfilling the piping, and the final
tightness test on the upgraded portion of the
piping prior to placing the UST system back into
service.
-
In the case of an UST upgrade for
leak detection, the test of the leak detection
device before the UST system is put into
service;
-
In the case of a repair of the
tanks, immediately before purging operations
begin and immediately before the tank is cut
open for entry, and the final tightness test
prior to placing the UST system into service;
-
In the case of a repair of
piping, the in-ground test of the piping prior
to backfilling the piping, and the final
tightness test prior to placing the UST system
back into service;
-
In the case of an UST removal,
immediately before purging operations begin,
immediately before the tank is cut open for any
purpose, and the actual removal of the UST
system from the ground;
-
In the case of abandonment in
place of UST systems, immediately before purging
operations begin, immediately before the opening
of the tanks top, and at the completion of the
actual filling of the tank with the inert solid
material before the UST.
| |